Your panel is the heart of your electrical system. If yours is a fuse box, an aging 60- or 100-amp service, or a panel that is full and struggling to keep up, an upgrade is not cosmetic. It is the foundation every other electrical decision rests on. We inspect the existing service, calculate the load you actually need, and complete the upgrade to code, with the ESA permit pulled and the inspection arranged from start to finish.
Often paired with ev charger installation, generator installation, and knob & tube rewiring. We coordinate the whole job under a single permit when it makes sense.

What’s included
- Load calculation and capacity planning for current and future demand
- Removal of legacy 60-amp or 100-amp service and old fuse boxes
- 200-amp service upgrade with new meter base, mast, and main breaker
- Panel changes and replacements for code compliance and new appliances
- Permit pulled and ESA inspection coordinated end to end
- Clean, clearly labelled panel layout for future serviceability
When to call us
- Breakers tripping when major appliances run at the same time
- A panel with screw-in fuses or no room left for new circuits
- Plans for an EV charger, heat pump, hot tub, or basement renovation
- Burn marks, buzzing, or warm spots near the panel
- An insurer or buyer asking for documentation of your service rating
How it works
- 01On-site assessment
We review your existing service, current load, and what you are planning, then confirm what the upgrade actually involves.
- 02Permit & schedule
We pull the ESA permit and book the utility disconnect window with London Hydro.
- 03Install day
Old service out, new 200-amp service in, panel reorganized and clearly labelled. Power is restored the same day in most cases.
- 04Inspection & sign-off
ESA inspects, the certificate is issued, and you get the paperwork your insurer or future buyer will want.




